Metalizing Process | Inspection Packing and Shipping

Finished parts are moved to the final inspection and packing area where they are removed from the fixtures and inspected.

Inspection criteria are per each customer's standard for that individual part and according to their own requirements following ISO 9001 — ISO/TS 16949 — AS 9100 guidelines. A custom database is utilized to track process error trends which allows information needed to make constant changes in order to assure quality.

A tracking tag is included in every box to ensure traceability of parts throughout the entire process.

Parts are then packed for shipment according to customer's specifications.